Manufacturing
Equipment Parts Manufacturing
Step 1.This is the start of the process. Customers can choose any color for the plastic parts of the machine.
|
Step 2. We equip many plastic injection machines in our factory. Use plastic injection molding technique to molding the plastic parts of the fitness equipment.
|
Step 3. Cut the steel tube into different sizes of pipes.
|
Step 4. Bend the pipes to form steel parts using in the handle and the base.
|
Step 5: Welding process is the procedure welding many parts together.
|
Step 6. The steel parts are going through a process of color spray and protective materials.
|
Assembly & Packing & Delivery
Step 7.The steel material is prepared before processing and forming.
|
Step 8. The machine parts are assembled, we are able to assemble hundreds of machines each day.
|
Step 9. The assembling floor is ready for manufacturing last stage, and products also go through intense quality control.
|
Step 10. Put every necessary part into the carton and pack.
|
Step 11. Do the examination once again to assure we can provide our customer the best quality fitness equipment.
|
Step 12.We put most effort and thought to make sure all parts are placed correctly and the packing is strong enough to protect the machine.
|
Step 13.The machines are packed and getting ready for shipment.
|
Step 14.Loading of the container. Extra spare parts are added to the shipment.
|
Step 15.Shipping out of the factory.
|